Laserfiche WebLink
1.Determine detailed project needs from the "Environmental <br /> Document" and the "Project Report'L <br /> <br /> 2.Prepare and submit checked structure plans, specifications <br /> and estimate. <br /> <br /> 3.Determine need for various permits. Obtain permits as <br /> requi red during project development process. <br /> <br /> 4. Initiate 'design discussions ,~ith various Caltrans sections <br /> regarding: <br /> <br /> Bridge Structures <br /> Hydraul i cs <br /> Electrical <br /> Traffic (signalization, signing and striping) <br /> Landscape <br /> Prepare Special Provision Outline <br /> <br /> 5. Prepare and submit reports and recommendations to Caltrans. <br /> 6. Prepare preliminary quantities and cost estimate. <br /> 7. Prepare and circulate preliminary P.S.&E. <br /> <br /> 8. Complete, obtain signatures and deliver final P.S.&E. to City. <br /> <br />Task 6. Act as the City's.. Representative <br />Task 7. Provide Liaison to City and Caltrans <br />As required, upon commencement of construction. <br /> <br /> -3- <br /> <br /> <br />