My WebLink
|
Help
|
About
|
Sign Out
RES 85062
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2012 12:50:04 PM
Creation date
12/22/1999 10:39:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/12/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br /> <br />THIS AGREEMENT, made and entered into this 1985 <br />by and between the CITY OF PLEASANTON, a municipal corporatio~ of th~ <br />State of California, hereinafter called the "CITY" and TJKM, a <br />California Corporation, hereinafter call the "ENGINEER." <br /> <br /> WITNESSETH: <br /> <br />WHEREAS, the CITY desires to contract for certain engineering work to <br />include the evaluation of future traffic on Del Valle Parkway between <br />Main Street and Bernal Avenue; and <br /> <br />WHEREAS, the ENGINEER is qualified and willing to do said engineering <br />work and provide said evaluation. <br /> <br />NOW, THEREFORE, in consideration of the mutual covenants, promises and <br />agreements herein set forth, the parties do hereby agree as follows: <br /> <br />1. Scope of Work <br /> <br /> a. Prepare build-out traffic volumes on gel Valle Parkway between <br /> Main Street and Bernal Avenue with and without the connection <br /> between Stanley and Bernal. <br /> <br /> b. Determine appropriate alternate intersection configuration <br /> recommendations at Main and Del Valle/Stanley. <br /> <br /> c. Evaluate traffic conditions on nearby affected streets including <br /> Vineyard-Ray, Division, Valley extension and Bernal Avenue. <br /> <br /> d. Recommend lane requirements, curb-to-curb widths, parking and <br /> bicycle lane needs along Del Valle Parkway as input for plan <br /> line/general plan evaluation. <br /> <br /> e. Prepare a report summarizing findings and recommendations. <br /> <br /> f. Assist in up to two public hearings as required. <br /> <br />2. CITY Services <br /> <br /> CITY agrees to provide such information, records, plans, data and <br /> files as are currently available and necessary for ENGINEER to <br /> complete its work under this agreement. CITY will be responsible <br /> for overall project administration. <br /> <br />3. Staff <br /> <br /> Project Manager for ENGINEER shall be Chris D. Kinzel, P.E. He will <br /> not be removed from the project without the prior approval of CITY. <br /> <br /> -1- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.