Laserfiche WebLink
SR 85:20 <br /> Page 2 <br /> <br /> Pleasanton Aquatic Center $13,900 <br /> <br /> - A hoist for the two swimming pools <br /> will need to be purchased and installed. <br /> Access to the restroom and shower <br /> facilities willneed to be constructed <br /> which will require some remodeling of the <br /> front of the building as well as the <br /> individual facilities (i.e., ramps <br /> constructed in shower area, widening <br /> of stalls to toilet facilities, etc.) <br /> <br />Civic Center $800 l, <br /> <br /> - The drinking fountain in the lobby and <br /> Civic Center will be lowered to meet <br /> State requirements. <br /> <br />Amador Recreation Center $6,200 i, <br /> <br /> - The restroom access doors need to be <br /> widened and therefore, will require <br /> some remodeling of the building. Also, <br /> the stalls within the restrooms will <br /> have to be rearranged and one water <br /> closet for both the men's and women's <br /> facilities will have to be removed and <br /> replaced with facilities that are <br /> specified for the disabled. <br /> <br />Cultural Arts Center $100 1, <br /> <br /> - According to th city building inspector, <br /> the only improvements needed to correct <br /> situation is to place markings around the <br /> drinking fountain. <br /> <br />Valley Community Health Center $30,000 2 <br /> <br /> - Expand health clinic from approximately <br /> 3,800 sq. ft. to 8,000 sq. ft. either <br /> through lease or construction. Funding <br /> is also being recommended for 1987-88. <br /> In addition, the applicant is also <br /> requesting funds from the cities of <br /> Dublin and Livermore and Alameda County. <br /> <br /> <br />