Laserfiche WebLink
Mr. Michael Fulford <br />Landscape Architect/Inspector <br />November 14, 1986 <br />Page Three <br />E Extra 1Pork <br />1) Perform any related work requested by the City beyond the Scope of <br />Services hereinabove defined and at rates given in the Hourly Fee Schedule, <br />Exhibit "B" of this proposal <br />Notes The above Scope of Work is based on one (1) Construction Document <br />package. If separate additional Construction Document packages are <br />requested by the City, additional compensation would be necessary. <br />II AHA Ina. Compensation <br />A. Working at rates given in Exhibit A, below, AKA, Inc. proposes the following <br />compensation for work outlined in I A-D above. <br />1) For work described under IA (1-2) and (4-9), maximum compensation would <br />be the Lump Sum of Thirt~Five Thousand and no/100 Dollars ($35,000.00). <br />2) For work described in IA (3) above, maximum compensation would be the <br />Lump Sum of Eight Thousand Six Hundred and no/100 Dollars ($8,600.00). <br />3) For work described in IB, fee shall be based on a percentage of actual <br />Construction Cost ranging from 7.5% for $1,000,000.00 of Construction <br />Cost to 7.0% for $1,500,000 of Construction Cost prorated proportionally <br />for costs within the range plus a Fixed Sum of Two Thousand One Hundred <br />and no/100 Dollars ($2,100.00) to cover the cost of printing the first 60 <br />sets of Plans and Specifications. <br />4) For work described under Section IC (1), fee shall be 1.4% of actual <br />Construction Cost. <br />5) For work described under Section IC (2-5), fee shall be 1.5% of actual <br />Construction Cost. <br />6) For work described under Section ID 1(Alternative Construction Adminis- <br />tration), fee shall be 1.4% of actual Construction Cost. <br />7) For work described under Section ID (2-5), fee shall be 2.5% of actual <br />Construction Cost. <br />