Laserfiche WebLink
TASK <br /> <br />Prepare land-use scenarios $ 500 <br />Model Analysis 3,000 <br />Analysis of model results 3,000 <br />Prepare Report 1,500 <br />Attend meetings (assume four) 2.000 <br /> $10,000 <br /> <br /> E,XHIBiT "A" <br /> Page 2 of 2 <br /> <br /> <br />