Laserfiche WebLink
PLEASANTON <br /> SACRAMENTO <br /> FRESNO <br /> TRANSPORTATION CONSULTANTS CONCORD <br /> <br />September 23, 1986 <br /> <br />Mr. Chandler Lee <br />Principal Planner <br />Planning Department <br />200 Old Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Dear Chandler: <br /> <br />This is to provide you with TJKM's proposal to provide a traffic study for the <br />extension of Stoneridge Drive, improvements to El Charro Road, and <br />recommendations for the intersection of Stoneridge Drive and El Charro Road. <br /> <br />TJKM would analyze three buildout scenarios using the traffic model used for the <br />Pleasanton General Plan. We would summarize the results of these model runs in a <br />report and include recommendations for roadway cross-sections, intersection lane <br />arrangements, interchange configurations, and maintenance of truck operations on <br />El Charro Road. <br /> <br />As you know, we are currently conducting a related study for the City of <br />Livermore in conjunction with the Reynolds C. Johnson development. There are <br />several transportation issues in this area that have the potential to create <br />disagreements between the Cities of Pleasanton and Livermore. TJKM sees this as <br />an opportunity to forge a compromise between the two cities and the other <br />interests involved as well. However, such a goal is likely to take some time and <br />money. <br /> <br />The attached table shows TJKM's proposed scope of services by task and the <br />associated cost of these services. TJKM is proposing to prepare an initial study <br />and attend up to four meetings for a lump sum amount of $10,000. This work is <br />expected to be completed eight weeks from the notice to proceed. The initial study <br />can be used by the City of Pleasanton to try to reach a consensus with the other <br />involved parties. TJKM will be available for additional work and/or meetings at <br />the hourly rates shown on the attached billing rate table. <br /> <br />It is our pleasure to provide this proposal for transportation engineering services to <br />the City of Pleasanton. As always, we are available if you have any questions <br />regarding this matter. <br /> <br />Rog%. Henderson . <br />Senior Transportation Engineer <br /> <br />RBH/rah <br />Attachments EXHIBIT "A" <br />13-4P.3RH Page 1 of 2 <br /> <br /> 4637 Chabot Drive, Suite 214 / Pleasanton, California 94566, (415) 4~0611 <br /> <br /> <br />