My WebLink
|
Help
|
About
|
Sign Out
RES 86518
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2012 1:50:02 PM
Creation date
12/17/1999 12:22:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/18/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 3, 1986 5 <br />Joseph Elliott <br /> <br /> 2' contours ara locate all trees within the property line <br /> ~uuld be a lump sun fee of $3,000 for each park. <br /> <br /> IV. PAYMENT <br /> <br /> Architect based on hours .spent on the project during <br /> the mnnth. Until each ~hase is accepted by the <br /> Client, b{1]~ngs for the project will rrfc exceed the <br /> follawing cumulative <br /> <br /> Mission Hills Park <br /> sd~a~c~i~ ~~ ph~e $10,900 <br /> <br /> Oakl~-x]/~renery Park <br /> Schenatic/Design Devel.ogTent Phase $10,700 <br /> Contract Docznent Phase 14,250 <br /> Construction Consultation Phase Hourly <br /> <br />V. LANDSCAPE A/EeTELT'S ADDITIONAL SERVIc~.-q <br /> <br /> The follcwing services cause the Iarasca.~e Architect extra <br /> expense. If any of these services are authorized by the <br /> Client they shall be reimbursed to the ~pe Architect <br /> at the attached billing rates unless otherwise ir~cated. <br /> <br /> A. Pavising previously a.uproved drawing, construction <br /> budgets, ard/or specifications to acca~ budget <br /> reductions ara/or design chanqes requested by the <br /> Client. <br /> <br /> B. Preparin~ documents for alternate bids or change <br /> <br /> C. Arranging for %urk to proceed should the Construction <br /> Contractor default due to delinquency or insolvency. <br /> <br /> D. .Prepari~ ~ts for more than ~ne phase of <br /> construction, includi~ the fast tracking of a single <br /> construction project if it requires issuing of <br /> contract docanents for biaa~ng at separate times. <br /> <br /> E. Premrin~. ~rate mm~h ~ PLus. <br /> <br /> F. Aaditicnal site visits. <br /> <br /> ~he Client sh~l! supply the Iandscape Architect with the <br /> followi~ prior to the Landscape Architect' s ccnmenc~ <br /> ~Drk upon which said information is based. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.