Laserfiche WebLink
November 3, 1986 4 <br />Joseph ~3liott <br /> <br /> at the request of the client. ~hese <br /> services ~]l be billed on our star~d <br /> hourly rate-s, see attache?_ billing rates. <br /> We would anticipate a minimum of four (4) <br /> site visits during the ccnstruction at <br /> critical jurrtures of the project. ~le <br /> times ~ feel are ~ are: 1) to check <br /> finish gradirg, 2) check bardscape <br /> finishes/play equi~nent placenent, <br /> 3) planting placement, 4) fir~l inspection. <br /> <br /> 2. ~e LarrYcape Architect sb~] l not have control or <br /> charge of and sb~]l not be responsible for <br /> <br /> sequences or procedures, or for safety <br /> <br /> work, for the acts or cmissions of the <br /> Contractor, Sub-contractors or any other persons <br /> performing any of the ~Drk, or for the failure of <br /> any of them to carry out the work in accordance <br /> with the contract docu~_nts. <br /> <br /> 3. Review ~op drawings, samp_les ar~ other <br /> sukrtit~ ] -~ re~ ~ ~ red of the Contractor. <br /> <br />II. CCMPENSATION <br /> <br /> A. For the above professior~l services, the Lar~ <br /> Architect shall be paid a lump sum of: <br /> <br /> $10,900 - .Master Plan of Mission Hills <br /> 10,700 - Master Plan of Oaklm~~ <br /> $21,600 <br /> <br /> All reimbursables which include postage, ~ssengers, <br /> report are included in the base fee. <br /> <br /> B. I~e fee for Construction Documents on Oaklar~/~ <br /> sb~] 1 be a lu~. s~n of $14,250. <br /> <br /> III. OPTIC~AL SERVICE <br /> <br /> Mission Hills Park ar~ Oakland/Trenery are lacking any <br /> survey information. It is antic'.~pated that accurate grcur~ <br /> control and aerial information be ccr~leted so that <br /> m~u~ ng with preliminary contours can be acccmpl ~-~hed <br /> during the master plan phase. A Civil Englander ~Duld r~ <br /> <br /> <br />