My WebLink
|
Help
|
About
|
Sign Out
RES 86453
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2012 4:19:18 PM
Creation date
12/16/1999 11:30:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/7/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gas Migration Mitigation Agreement <br /> September 5, 1986 <br /> Page 5 <br /> <br /> · ARTICLE III <br /> <br /> TERM <br /> 3.01 The term of this Agreement shall commence on <br /> <br />September__, 1986, and continue until (1) methane gas is no <br />longer being generated on the LANDFILL by municipal waste in <br />significant amounts and (2) methane gas already generated no <br />longer remains on or under the LANDFILL site or the OWNERS' <br />PROPERTY in significant amounts. <br /> <br /> 3.02 At such time as PGS believes that both <br /> <br />conditions set forth in Section 3.01 exist and a consultant <br />acceptable to the CITY determines that both conditions exist, <br />PGS may send a termination notice to the CITY and OWNERS with a <br />copy of the report setting forth the consultant's determi- <br />nation. If the OWNERS disagree with the determination of the <br />consultant, the CITY shall serve as or appoint an arbitrator to <br />determine if the termination is proper. The cost of <br />arbitration shall be paid by PGS. <br /> <br /> ARTICLE IV <br /> <br /> PRIMARY MITIGATION MEASURES BY PGS <br /> <br /> 4.01 Pursuant to Order No. 78-60 issued by the <br /> <br />Regional Water Quality Control Board for the San Francisco Bay <br />Region, PGS has been ordered to comply with certain specifi- <br />cations in connection with the closure of LANDFILL. Such <br />specifications include the requirement to install methane gas <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.