Laserfiche WebLink
TJKM <br />Transportation <br />Consultants <br />TABLE I <br />Preliminary List of Roadway and Intersection Projects <br />to be Considered in Pleasanton 2008 TIF Update <br />Possible Road Projects <br />I . EI Charro Road -Stoneridge Drive to Stanley Boulevard -Construct as 4 lane divided <br />2. Busch Road -Valley Avenue to EI Charro Road -Construct as 4 lane divided <br />3. Nevada Avenue -First Street to California Avenue <br />4. Sycamore Creek Way -Dimas Court to Westbridge Lane -Construct as 2 lane street <br />5. Bernal Avenue -Valley Avenue to I-680 -Widen/restripe as 6 lane divided <br />6. Bernal Avenue - I-680 to Meadowlark -Widen/restripe as 4 lane divided <br />7. Bernal Avenue west of Meadowlark -Widen bridge, extend 3 lanes to Foothill <br />8. Foothill Road - (-580 to Stoneridge Drive -Widen/restripe to 6 lanes divided <br />9. Stoneridge Drive -Extend 0.5 mile as 4-lane divided w/o EI Charro. Include 2nd bridge <br />10. Hopyard Road -Valley Avenue to Del Valle <br />Parkway -Widen to 4 lanes <br />Additional Candidates From 1998 List <br />I. Dublin Canyon Widening <br />2. Foothill Road/I-580 interchange reconfiguration <br />and signals <br />3. Sunol Road/I-680 interchange improvements <br />and signals <br />4. Foothill Road widening various locations <br />Possible Intersection Improvements <br />I . Bernal Ave. at Meadowlark Drive -Widen with roadway improvements <br />2. Bernal Ave. at Case Ave. -Add southbound right turn lane <br />3. Foothill Rd. at Canyon Way -Add 3rd southbound left turn lane and receiving lane <br />4. Foothill Rd. at High School -Improve signal operations <br />5. Hacienda Dr. at Owens Dr. -Add 3rd southbound and eastbound left turn lanes <br />6. Hopyard Rd. at Owens Dr. -Add northbound and southbound left turn lanes; add eastbound <br />and westbound lanes. <br />7. Main St. at E. Stanley -Add 2^d southbound lane and receiving lane <br />8. Stoneridge Dr. at Hopyard Rd. -Provide eastbound free right turn lane <br />9. Stoneridge Dr. at Johnson Dr. - Restripe and widen to accommodate 2^d NB I-680 lane <br />10. Valley Ave. at Santa Rita Rd. -Construct 2^d westbound left turn lane <br />I I . Valley Ave. at Bernal/Stanley -Construct NB free right turn lane and 3rd EB through lane <br />12. Santa Rita Rd. at I-580 eastbound off-ramp -Construct 2^d southbound left turn lane <br />13. Stoneridge Dr. at W. Las Positas -Construct 2^d southbound left turn lane; restripe eastbound <br />lanes. <br />Proposal to Update the Tragic Development Impact Fee Program Page 11 <br />In the City of Pleasanton Apri12S, 2008 <br />