Laserfiche WebLink
06080 Pavement Recycling Design Proposal -4- <br /> <br /> b) Atterberg Limits <br /> 3 @ $160/ea. 480 <br /> <br /> c) Asphalt Recycled Mix Design- <br /> 2 @ $300/ea. 600 <br /> <br /> d) Lime-Cement-Kiln DUst <br /> Recycled Mix Design <br /> I @ $850 850 <br /> <br /> Testing Subtotal $2560 <br /> <br />4. Analyze all data, prepare pavement <br /> structural designs, recycle alternatives <br /> and prepare technical specifications <br /> 16 hrs. @ $87/hr. $1392 <br /> <br />5. Prepare Engineering Report <br /> 8 hrs. @ $75/hr. 600 <br /> Printing, binding, etc. - lump sum 150 <br /> <br />6. Coordination with City Staff <br /> 6 hrs. @ $75/hr. 450 <br /> <br /> Engineering Subtotal $2592 <br /> <br />7. Miscellaneous and contingencies <br /> Estimate 15% $1105 <br /> <br /> GRAND TOTAL $8472 <br /> <br />If you have any questions concerning our proposal, please <br />contact me at our Concord office, (415) 671-0453. <br /> <br />We look forward with great interest to assisting the City on <br />this important and extremely interesting project. Please <br />accept our sincere appreciation for the opportunity to <br />provide this proposal. <br /> <br />Yours for better pavements, <br /> <br />CHEC Consultants, Inc. <br /> <br />Gerald Evans <br />Principal Engineer <br /> <br /> <br />