Laserfiche WebLink
SECTION II <br /> <br />CITY AGREES: <br /> <br /> (1) To prepare plans, specifications and estimate <br /> <br />(preliminary engineering) for PROJECT, except for the auxiliary lanes <br />and edge drains, and to bear the full cost of preliminary engineering <br />'for PROJECT. Said preliminary engineering shall be subject to <br />SERVICES to be performed by STATE. <br /> <br /> (2) All phases of PROJECT involving STATE highway <br />facilities, whether handled by CITY or STATE, shall be developed in <br /> <br />accordance with all policies, procedures, practices, standards, <br /> / <br />specifications .and re ulatiou_s that apply to STATE <br /> <br /> (3) To deposit with STATE within 25 days of receipt of <br />billing therefor (which billing will be forwarded immediately <br />following execution of this agreement) the amount of $230,000 which <br />represents the estimated cost for STATE's preliminary engineering for <br />the auxiliary lanes and edge drains and SERVICES as shown on Exhibit <br />A. <br /> <br /> (4) To deposit with STATE within 25 days of receipt of <br /> billing therefor (which billing will be forwarded immediately <br /> following STATE's bid advertising date of a construction contract for <br /> PROJECT), the amount of $6,780,000 which figure represents eITY's <br /> <br /> -5- <br /> <br /> <br />