Laserfiche WebLink
3/lz/so <br />T0: Planning <br />_ Tentative Map <br />Page 4 <br />22. <br />23 <br />24. <br />25. <br />Commission <br />4551 <br />That electric power distributi <br />be placed totally underground. <br />That approval of the water su <br />be withheld until the develop <br />satisfaction of the City Engi <br />meets both the immediate and <br />supplying water in this area. <br />That approval of the sanitary <br />the developer has demonstrated <br />Engineer that the proposed sys <br />area and generally meets the i <br />ments of the sanitary sewer sy <br />areas. <br />That approval of the storm dra <br />final design calculations have <br />has demonstrated to the satisf <br />the system fully meets the req <br />all upstream areas intended to <br />and that the requirements of A <br />District have been met. <br />26. That a list of street names for <br />Planning Director for approval <br />map. <br />27. That all wells and septic tanks <br />sealed, filled and abandoned pr <br />operations on the tract develop <br />28. That a grading plan be submit <br />the improvement plans. <br />29. That the design of the noise <br />shall be approved by the Pla <br />map approval. <br />and communication service systems <br />and distribution system <br />s demonstrated to the <br />that the proposed system <br />range requirements for <br />r system be withheld until <br />the satisfaction of the City <br />is adequate for the service <br />fate and long range require- <br />in this and all tributary <br />ge system be withheld until <br />en made and the developer <br />ion of the City Engineer that <br />ements of this development and <br />drained through this tract <br />eda County Flood Control <br />his tract be submitted to the <br />for to submittal of a final <br />the property be properly <br />to the start of grading <br />t. <br />for approval as a part of <br />adjacent to Parcels 34-42 <br />Division prior to final <br />