Laserfiche WebLink
PLANNING COMMISSION <br />CITY OF PLFASANTON <br />COUNTY OF ALAMEDA <br />STATE OF CALIFORNIA <br />RESOLUTION NO. 1759 <br />A RESOLUTION OF THE PLANNING COMMISSION OF THE <br />CITY OF PLEASANTON APPROVING TENTATIVE MAP, <br />TRACT 4257, LONGVIEW. <br />WHEREAS, Dr. Howard Long has applied for tentative map approval <br />for Tract 4257 for a 10-lot subdivision on a 50+ acre site <br />located at the northwest quadrant of the terminus of <br />Longview Drive; and <br />WHEREAS, the Planning Commission reviewed this application on <br />June 13, 1979; and <br />WHEREAS, the Planning Commission reviewed the possible environ- <br />mental effects of the project and found that with the <br />conditions of approval, there would be no significant <br />effect; and <br />WHEREAS, the Planning Commission found that the map is in con- <br />formance with the Pleasanton General Plan. <br />NOW, THEREFORE, THE PLANNING COMMISSION RESOLVES THE FOLLOWING: <br />Section 1. The Planning Commission approves Tentative Map, <br />Tract 4257, subject to the conditions listed below <br />and attachments which are made part of this approval by <br />reference. <br />1. That all conditions of Ordinance No. 883 approving <br />case PUD-78-1 shall be met. <br />2. That approval of the line, grade and structural <br />sections of Longview Lane be withheld pending <br />final design and approval of the final map. <br />3. That the water system include a tieline to the <br />existing water main on Pleasanton Ridge and that <br />approval of the system for domestic and fire <br />protection purposes shall be withheld pending final <br />designs, calculations and approval of the final map. <br />4. That the existing 8" water line be raised or lowered <br />at the developer's expense if required for inadequate <br />or excess cover. <br />5. That approval of the sanitary sewer collection system <br />be withheld pending final design and approval of the <br />final map. <br />6, That approval of the storm drain system be withheld <br />pending final design and approval of the final map. <br />