Laserfiche WebLink
Arroyo del Valle <br />The Arroyo del Valle is an exi <br />to its point of discharge into <br />Nominal control of the channel <br />trol measures rests with the A <br />Zone 7. <br />This reach of the channel from t <br />Street bridge is currently under <br />policy is to transfer private ow <br />ownership as development occurs <br />ownership is normally vested in <br />effective maintenance. <br />A specific condition of approval <br />dedication of the Arroyo del Val: <br />the property line near the channe <br />top of bank line. <br />This dedication line will be def. <br />for the proposed subdivision. <br />Zone 7 requirements will include, <br />channel area of weeds, brush and <br />damaged banks, provisions for an <br />channel for maintenance vehicles, <br />bank into channel and a minimum r <br />structures. <br />Proposed Trail System <br />The East Bay Regional Park Distr <br />Manual adopted in revised form i <br />Pleasanton General Plan for Bicy <br />approved on January 27, 1977 by <br />the authority, guidelines, and g <br />trail system along the Arroyo de <br />These plans and current City poll <br />system right-of-way by subdivisic <br />of private development. <br />As part of the dedication of the <br />from the developer to Zone 7, an <br />Zone 7 to the City of Pleasanton <br />The .trail system as proposed wou: <br />bicycles, and for access for main <br />The trail should have a minimum : <br />Assuming adequate soil bearing c~ <br />2-inch layer of asphaltic concrel <br />rock on compacted subgrade with <br />Information given in the E.B.R.P <br />general design criteria. <br />flood channel from Del Valle Dam <br />Arroyo de la Laguna at Highway 680. <br />the responsibility for flood con- <br />a County Flood Control District - <br />e Main Street bridge to the Division <br />private ownership. Current City <br />ership of the channel to public <br />djacent to the channel. This public <br />one 7 for greater control and more <br />of this development should be the <br />.e by the developer to Zone 7 from <br />'1 centerline to the approximate <br />ned more precisely on the final map <br />but are not limited to, clearing <br />undergrowth, repair of eroded or <br />all weather access road along the <br />no surface drainage over top of <br />.umber of storm drain outfall <br />ct Regional Trails Plan and Trail <br />October, 1976 and the City of <br />le, Horse, and Hiking Trail Systems <br />he Pleasanton City Council provide <br />neral criteria for a joint use <br />Valle. <br />.cy call for acquisition of the trail <br />~n process and conditions of approval <br />Arroyo del Valle channel right-of-way <br />easement would be obtained from <br />for use of the proposed trail system. <br />.d be for joint use for hiking, <br />itenance and emergency vehicles. <br />.0' wide paved width far. vehicles. <br />ipacity on the na~. ive ground, a <br />.e pavement overt inches of base <br />~ soil sterilant would be required. <br />Trail Manual will be used as <br />