My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENTS 1 - 7
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
061708
>
14 ATTACHMENTS 1 - 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2008 9:21:34 AM
Creation date
6/13/2008 9:21:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/17/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 5 <br />CONTRACT <br />BERNAL AVENUE BRIDGE AND STREET WIDENING <br />FROM VINEYARD AVENUE TO DEL VALLE PARKWAY PHASE III <br />PROJECT NOS. 995067 AND 005029 <br />AND <br />DEL VALLE PARKWAY SEWER IMPROVEMENTS, PROJECT N0.902028 <br />THIS CONTRACT is made and entered into this day of , 20_ by <br />and between ("Contractor"), whose address is <br />,and telephone number is <br />PLEASANTON, a municipal corporation ("City"). <br />WITNESSETH: <br />and the CITY OF <br />WHEREAS, the City has awarded to the Contractor a contract for BERNAL <br />AVENUE BRIDGE AND STREET WIDENING FROM VINEYARD AVENUE TO <br />DEL VALLE PARKWAY PHASE III, PROJECT NOS. 995067 AND 005029 AND <br />DEL VALLE PARKWAY SEWER IMPROVEMENTS, PROJECT N0.902028. <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein, <br />the parties agree as follows: <br />Work to be Performed. The work will generally consist of: <br />• Constructing Bernal Avenue Bridge, a four span P/C P/S concrete slab bridge <br />with cast-in-place deck, 284 feet in length and 42 feet wide. <br />• Planting and irrigation along the corner of Bernal Avenue and Vineyard <br />Avenue. <br />• Traffic signal modification for the ultimate roadway alignment at the <br />intersection of Bernal Avenue at Vineyard Avenue. <br />• The work also consists of the widening of Bernal Avenue between Vineyard <br />Avenue and Del Valle Parkway to accommodate the new two-lane bridge and <br />overlay of the existing pavement section between Nevada Court and Tawny <br />Drive. <br />• Constructing 340 feet of 18" PVC sanitary sewers, and 360 feet of 18" HDPE <br />sewer line on Bernal Avenue. <br />• Provide grading, planting, irrigation, and 1 year maintenance services as part <br />wetland and ripaxian mitigation requirements for the subject project. <br />Said work is more particularly shown in the following documents which are on <br />file with the Department of Public Works of the City and are incorporated herein <br />by this reference: <br />
The URL can be used to link to this page
Your browser does not support the video tag.