My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENTS 1 - 7
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
061708
>
14 ATTACHMENTS 1 - 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2008 9:21:34 AM
Creation date
6/13/2008 9:21:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/17/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br />Bernal Ave. Bridge & Street Widening and a portion of Nevada Street <br />Sewer Improvements <br />CIP Nos. 995067 and 902028 <br />6/3/2008 <br />Project Funding to Date Amount <br />CIP 995067, Bernal Ave. Bridge 8~ Bernal Ave. Widening $3,749,700 <br />Plus $2,530,813 approved for 2008-09 CIP allocation $2,530,813 <br />SUBTOTAL FUNDING $6,280,513 <br />Expenditures/ Emcumbrances To Date <br />CIP 995067, Bernal Bridge & Bernal Ave. Widening $2,652,295 <br />SUBTOTAL AVAILABLE FUNDING $3,628,218 <br />Construction Budget (includes sewer) <br />Gordon N. Ball Inc., Construction Base Bid <br />(includes $449,333 for Bernal Property wetlands) $3,917,373 <br />Construction Contingency (15%) $587,606 <br />S&C Engineering (Construction Mgmt. & Inspection support) $269,640 <br />Kier & Wright (Surveying services) $41,475 <br />Soil testing for mitigation site $15,000 <br />Miscellaneous (red-legged frog habitat, reproduction, materials, etc.) $25,000 <br />Sub-Total Construction Cost $4,856,094 <br />TOTAL PROJECT BUDGET $7,508,389 <br />Funding Balance/ (Shortfall <br />Current Balance/ (Shortfall) ($1,227,876) <br />Transfers to Meet Shortfall: <br />Approximate Transfer from Nevada Street Sewer Improvements @ <br />construction completion (CIP No. 902028) $288,600 (1) <br />Transfer from Dublin Canyon Bridge (CIP 995066) $525,000 (2) <br />Transfer from Dougherty Valley Mitigation Reserve (CIP 025023) $414,276 (3) <br />1. CIP 902028 reduced to approx. $913,992 <br />2. CIP 995066 reduced to approx. $102,494 <br />3. CIP 025023 reduced to approx. $364,024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.