My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENTS 1 - 7
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
061708
>
14 ATTACHMENTS 1 - 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2008 9:21:34 AM
Creation date
6/13/2008 9:21:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/17/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />BERNAL AVENUE BRIDGE AND STREET WIDENING FROM VINEYARD AVENUE TO DEL <br />VALLE PARKWAY PHASE III, PROJECT NOS. 995067 & 005029 <br />AND <br />DEL VALLE PARKWAY SEWER IMPROVEMENTS, PROJECT N0.902028 <br />Provide construction management services including; contract administration; <br />construction inspection; and materials testing for capital improvement project: BERNAL <br />AVENUE BRIDGE AND STREET WIDENING FROM VINEYARD AVENUE TO DEL <br />VALLE PARKWAY PHASE III, PROJECT NOS. 995067 & 005029 AND DEL VALLE <br />PARKWAY SEWER IMPROVEMENTS, PROJECT NO. 902028. <br />PHASE I - PRECONSTRUCTION <br />1. ADVERTISE, BID, AND AWARD <br />CONSULTANT will assist City with advertising, bid inquiries, bid review, and <br />award of construction contract as required. <br />PHASE II -CONSTRUCTION <br />1. CONTRACT ADMINISTRATION <br />Administration -CONSULTANT shall perform all construction administration <br />activities, including correspondence and document control on an as needed <br />basis until completion of the project. Provide complete support services for field <br />personnel, including office support and coordination of inspection, surveying, and <br />testing. CONSULTANT will furnish all business equipment for CONSULTANT'S <br />work, except as noted below, such as computers, and cellular phones; <br />expendable supplies such as binders, pens, pencils, etc.. CITY will provide office <br />space, furniture, fax machine, Internet connection, utilities, and copier at no cost <br />to CONSULTANT. <br />Reporting -CONSULTANT shall utilize Caltrans procedures and policies, and <br />CITY requirements as necessary, regarding documentation of events, <br />compilation of quantities, contractor progress payments, final payment, and <br />record drawings. The required records pertaining to the job site staff include <br />attendance reports and overtime records. Records involved in monitoring <br />Consulting Services Agreement between May 9, 2008 <br />City of Pleasanton and S&C Engineers, Inc.Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.