My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
061708
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2008 9:15:04 AM
Creation date
6/13/2008 9:15:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/17/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 14 <br />~. ~o n .~. ' ~ u <br />j'L~E~S~4NTONo CITY COUNCIL AGENDA REPORT <br />June 17, 2008 <br />Public Works Department <br />TITLE: APPROVE PLANS AND SPECIFICATIONS, REVIEW BIDS, AND AWARD <br />CONSTRUCTION CONTRACT TO GORDON N. BALL INC. IN THE <br />AMOUNT OF $3,917,374, AND APPROVE CONSULTANT AGREEMENT IN <br />THE AMOUNT OF $269,640 WITH SAC ENGINEERING, INC. TO PROVIDE <br />CONSTRUCTION MANAGEMENT AND INSPECTION SUPPORT <br />SERVICES, FOR THE BERNAL AVENUE BRIDGE AND STREET <br />WIDENING FROM VINEYARD AVENUE TO DEL VALLE PARKWAY, CIP <br />NOS. 995067 AND 005029 AND DEL VALLE PARKWAY/NEVADA <br />STREET SEWER IMPROVEMENTS, CIP NO. 902028 <br />SUMMARY <br />The City has had a number of projects related to the expansion of the roadway network <br />at Bernal Avenue and Vineyard Avenue. The recommended improvements include the <br />construction of a second bridge on Bernal Avenue over the Arroyo Del Valle adjacent to <br />the existing bridge, the widening of Bernal Ave., approaching the bridge to allow two <br />lanes of vehicular traffic in each direction, construction of wetland and riparian mitigation <br />areas and installation of a sanitary sewer line. This second bridge construction and <br />roadway widening will reduce traffic congestion on Bernal Avenue in the vicinity of <br />Vineyard Avenue. The creation of wetland and riparian habitat are required to offset the <br />temporary and permanent construction impacts associated with the bridge's <br />construction. Bids have been received and staff is recommending award of the <br />construction contract to the lowest responsible bidder, Gordon N. Ball Inc., in the <br />amount of $3,917,373.85. Because of the specialized nature of this project, staff is <br />recommending approval of a consultant agreement with S&C Engineering, Inc. in the <br />amount of $269,640 to perform oversight of the bridge's construction in the form of <br />construction management and specialized inspection services. <br />RECOMMENDATION <br />1. Approve the plans and specifications for the subject project. <br />2. Review the bids received and award the construction contract to the lowest <br />responsible bidder Gordon N. Ball Inc. of Alamo, California, for a low bid amount <br />of $3,917,373.85. <br />3. Approve the consultant agreement with S&C Engineering, Inc. in the amount of <br />$269,640 to provide construction management and inspection support services. <br />4. Authorize the Director of Public Works to approve and execute contract change <br />orders for a contingency amount not to exceed $587,676 (15% of the contract <br />amount) for necessary related project work. <br />5. Authorize the City Manager to enter into the above-referenced construction <br />contract and consultant agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.