Laserfiche WebLink
rs~~~~ & >'~G~: <br />tY~M S>Dnw~~19M Cp^SUIFaN fS <br />• Draft Transportation Impact Analysis <br />• Final Transportation Impact Analysis <br />This scope of work assumes that only minor editorial comments are received on the Draft <br />Transportation Impact Analysis. We have budgeted 20 staff hours to prepare the final report. <br />Should an Environmental Impact Repot (EIR) be required for this project, we can prepare the <br />Transportation and Circulation section of the EIR in the format of the Environmental consultant <br />and respond to comment received on the Draft EIR. A cost estimate for this task will be <br />developed if required. <br />MEETINGS <br />This scope of work assumes attendance at one Planning Commission meeting and one City <br />Council Meeting. We will be available to attend additional meetings on atime-and-materials <br />basis. <br />Scope of Work Page 5 - 5 <br />