Laserfiche WebLink
Invitation to Bid on "As Needed Services " <br />Utilities - Polybutylene Service Replacement <br />• See sewer main section for required general specifications in addition to the three <br />listed below. <br />• Remove and replace polyeuylene services (1"through 2") with polyethylene tubing <br />per City of Pleasanton Drawing 301 Note 4 Column A. <br />• Repair water services on an "as required" basis and also on a 24-hour emergency basis <br />including overtime if required. <br />• Service replacement by "Pulling Method" <br />Utilities -Process Control Electrical <br />The City is requesting an experienced licensed contractor to perform routine and emergency <br />electrical and telemetry work for the Utilities Division. This work would be performed at any <br />of the City's water or sewer facilities located throughout the City. <br />All Contractors' employees shall comply with all Federal, State, and local laws and <br />regulations governing the installation and testing of electrical equipment and components. All <br />Contractors' employees shall comply will all OSHA and City policies regarding the proper <br />use of Lockout/Tagout procedures. <br />The following outline provides a scope of work for the City's expectations regarding "as <br />needed" electrical work for utilities: <br />• Provide routine electrical service at all utilities' pump stations and telemetry sites. <br />• Provide emergency service on a call out basis for these same locations. <br />• Provide troubleshooting and repairs to MCC (Motor Control Center) and control units <br />of varying voltage and phase. <br />• Perform work on water and sewer pumps varying in size from 2 H.P. to 450 H.P. <br />• Trouble shoot and repair remote telemetry units and controllers associated with water <br />and sewer systems. <br />• Provide installation of electrical systems at various locations. <br />Utilities -Water Pump Repairs <br />The City is requesting an experienced licensed contractor to perform routine and emergency <br />Water pump repair work for the Utilities Division. This work would be performed at any of <br />the City's water or facilities located throughout the City. <br />All Contractors' employees shall comply with all Federal, State, and local laws and <br />regulations governing the installation and testing of electrical pumping equipment and <br />components. All Contractors' employees shall comply will all OSHA and City policies <br />regarding the proper use of Lockout/Tagout procedures. <br />The following outline provides a scope of work for the City's expectations regarding "as <br />needed" Water pump repair work for utilities: <br />4 <br />