Laserfiche WebLink
The applicants have proposed to install two 9-foot, 8-inches tall wood trellis style <br />carports to provided the covered parking space for each lot. Staff feels that the provision <br />for the covered parking is an improvement over the current situation where no covered <br />parking is being provided for either residence. Additionally, staff feels that the informal <br />design of a wooden trellis structure is also appropriate given the constraints of the site <br />and the likelihood that new structures would be constructed at some point in the future. <br />Site Development Standards <br />The site development standards for the proposed development are outlined in the table <br />below. <br />Table 3.1 <br />Main Structures Parcel A Parcel B <br />Lot Size Min. 4,085 sq. ft. 5,161 sq. ft. <br />Setbacks: <br />Front Yard 20 ft. 20 ft. <br />Rear Yard 15 ft. 15 ft. <br />Side Yard 3 ft. minimum on the left 7 ft. minimum on both sides <br /> side and 7 ft. minimum on <br /> the right side <br />Building Height 30 ft. 30 It <br />Max.** <br />FAR Max.* 40% 40% <br />Accessory structures Parcel A Parcel B <br />(Class I) <br />Setbacks: <br />Front Yard 20 lt. 20 ft. <br />Rear Yard*** 5 ft. 5 lt. <br />Side Yard*** 3 ft. 3 ft. <br />Building Height 1 S ft. 15 ft. <br />Ma~.~* <br />* The FAR (Floor Area Ratio) excludes the access portion of Parcel B (net lot size). <br />** Measured from the lowest finished grade to the highest ridge point, including all chimney projections. <br />*** Setbacks are measured to the wall and eaves may encroach 1/3 into the setback area per the Building Code. <br />Class II Accessory Structures follow the R-1-6,500 zoning standards <br />At the time that Parcel B is redeveloped, the future design proposal is conditioned to <br />install beige colored interlocking pavers along the access corridor. <br />Given the historical nature of these aged structures, staff has also conditioned the future <br />homes to provide a cost analysis of restoring the structures verses new construction to <br />maintain the historical ties of the structures. If it is determined that the costs to retain and <br />Item 5. a., PUD-73, Maestas and Carey Page 7 of 12 Planning Commission <br />