My WebLink
|
Help
|
About
|
Sign Out
RES 86113
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 2:51:48 PM
Creation date
12/14/1999 12:21:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/18/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BISSELL & KARN, INC. <br /> <br />3. RTGHT-OF-WAY MAPPZNG <br /> <br /> Consultant shall prepare the necessary documents to obtain the ~ight-of- <br /> way necessary outside of Hacienda Business Park. <br /> <br /> These documents shal 1 include: <br /> <br /> - 'The preparation and processing through the County Surveyor of a Record <br /> of Survey showing all rights-of-way, property lines and centerline <br /> monumentation for the roadway from the Prudential property line to <br /> Santa Rita Road. <br /> <br /> - Preparation of plats and descriptions for the necessary easements from <br /> Alameda County Flood Control & Water Conservation District (Zone 7) <br /> and The Prudential Insurance Company. <br /> <br /> - Preparation of exhibits and descriptions for the highway easement from <br /> the U.S. Army. <br /> <br /> - Coordination of all of the above agencies to secure the recordation of <br /> the various right-of-way documents. <br /> <br />4. SUBCONSULTANTS <br /> <br /> Consultant shall contract for and coordinate the various subconsultants <br /> involved. The work involved in this item shall include: <br /> <br /> - Preparation of detailed landscape planting, irrigation and hardscape <br /> plans by POD, Inc., including quantity and cost estimates. Hardscape <br /> shall include the decorative walls and soundwalls, except for <br /> structural design, which will be specified on a design/construct <br /> basis. <br /> <br /> - Preparation of traffic signal modifications and striping plan by TJKM, <br /> including quantity and cost estimates. <br /> <br /> - Preparation of joint utility trench design by Utility Design, Inc., <br /> including quantity and cost estimates, and the utility modification~ <br /> required to the U.S. Army facilities. <br /> <br />5o CONSTRUCTION STAKING <br /> <br /> Consultant shall provide construction staking for the project. This <br /> staking shall include horizontal and vertical control for: <br /> <br /> - Rough grading of street right-of-way. <br /> <br /> - Sanitary sewer mainline, manholes and laterals. <br /> <br /> - Storm drain mainline, manholes, laterals and catch basins. <br /> <br /> - Domestic water mainline and laterals. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.