My WebLink
|
Help
|
About
|
Sign Out
RES 86113
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 2:51:48 PM
Creation date
12/14/1999 12:21:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/18/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BISSELL & KARN, INC. <br /> <br /> EXHIBIT 'A' <br /> SCOPE OF WORK <br /> <br />1. STREET IMPROVEMENT PLANS <br /> <br /> Consultant has previously prepared preliminary improvement plans for <br /> Stoneridge Drive from West Las Positas Boulevard to Santa Rita Road ("The <br /> Project") based on the original alignment. These plans will be revised to <br /> show the new alignment, as approved by the City. <br /> <br /> Included in this item are the following: <br /> <br /> - Preparation of plan and profile of the proposed roadway including <br /> alignment data and horizontal and vertical control, storm drainage, <br /> sewer and municipal water, street lights, reclaimed water and <br /> irrigation sleeves, and connections to existing street improvements. <br /> <br /> - Preparation of final Engineer's Estimate of quantities and <br /> construction cost including a breakdown of City's portion and other <br /> portions. <br /> <br /> - Preparation of bid documents to include contract specifications for <br /> all of the items of work. <br /> <br /> - Attendance at meetings, to a maximum of four man-days, for review and <br /> coordination of alignment and plan checking. <br /> <br /> - Coordination during construction, to a maximum of three man-days, to <br /> provide interpretation of the plans. <br /> <br />2. STRUCTURAL PLANS <br /> <br /> Consultant shall prepare plans for the bridge across the Arroyo Mocho. <br /> Included with these plans shall be the following: <br /> <br /> - Preparation of a hydraulics report. <br /> <br /> - Preparation of a Structure Type Selection Report and a Preliminary <br /> General Plan. <br /> <br /> - Design of the bridge and abutments (including computer time). <br /> <br /> - Preparation of detailed construction plans. <br /> <br /> - Bridge Plan Checking (this is an independent analysis of the design). <br /> <br /> - Preparation of contract specifications and final Engineer's Estimate <br /> of quantities and construction cost. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.