My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
052008
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 3:11:25 PM
Creation date
5/15/2008 3:11:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/20/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />VINEYARD CORRIDOR SPECIFIC PLAN WATER INFRASTRUCTURE BUDGET <br />CIP N0.011023 <br />5/20/2008 <br />Approved Budget <br />Water Tank and Access Road (Construction, Construction <br />Management, Contingency) $4,601,206 <br />Pump Station (Construction, Construction Management, <br />Contingency) $2,755,700 <br />Zone 7 Turnout (Construction) $231,312 <br />Final Access Road and Water Line Improvements $1,888,000 <br />Total (Based on City Council Authorization to <br />construct each project listed above.) $9,476,218 <br />Current Expenditures <br />Water Tank and 'rough grading of access road (Final)" $4,657,015 <br />Construction Contract with Change Orders $3,953,747.07 <br />Construction Management (Tetra Tech) $432,937.58 <br />Construction Support (Aliquot Engineering) $46,650.00 <br />Construction Support (Berlogar) $25,500.00 <br />Construction Support (Arborist) $16,700.00 <br />Additional Earthwork (Threehand) $181,480.00 <br />Pump Station (Construction, Construction Management, <br />Contingency) (Estimated) $2,520,000 <br />Zone 7 Turnout (Final) $258,632 <br />Construction Contract with Change Orders $228,632.00 <br />Zone 7 Inspection Fees $30,000.00 <br />Final Access Road and Water Line Improvements (Estimated) $1,888,000 <br />Total (Estimated) $9,323,647 <br />Current Remaining Contingency $152,571 <br />"Note: The additional earthwork included in the Water Tank and "rough-graded" access road expenditures are <br />attributed primarily to unforeseen soil conditions requiring removal of unstable soils and the replacement and <br />compaction of suitable soil materials along the access road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.