My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
052008
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 1:19:06 PM
Creation date
5/15/2008 1:19:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/20/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />The project consists of the removal and replacement of concrete curb and gutter, <br />sidewalk, driveways and curb through drains and installation of new access ramps on <br />various City streets as shown on Attachment 1. <br />Sidewalk maintenance is a part of an ongoing annual program. The locations are <br />selected from the Streets Division's work order requests and prioritized based on <br />severity of tripping hazards. Curb and gutter locations are selected from drainage <br />problem areas and where severe cracking and displacement of curb and gutter are <br />observed. The. repair locations also include damaged sidewalk and curb and gutter sites <br />evaluated by the City's Engineering Division. <br />DISCUSSION <br />Bids <br />An Engineer's Estimate for the project was calculated at $240,000. Sealed bids were <br />opened on April 17, 2008, with a total of ten bids received that ranged from $162,148:73 <br />to $239,971,.00 (see Attachment 2). The low bid of $162,148.73 was received from. <br />George Bianchi Construction, Inc. of San Jose. All bid documents were found to be in <br />order and past work performed by George Bianchi Construction was verified to be <br />satisfactory. <br />Budget __ <br />The project is fully funded through the City's Capital Improvement Program. Staff is <br />recommending: a 20% project contingency ($33,000.00) based on previous years' <br />experience. where. additional concrete repairs are necessitated during the removal <br />process of damaged concrete. A summary of funding sources and estimated <br />expenditures is presented in Attachment 3. <br />Schedule <br />The proposed schedule for the subject project is as follows: <br />Council Award of Contract .May, 2008 <br />Start of Construction June, 2008 <br />End of Construction July, 2008 <br />Submitted by: <br />~ .L I,.~JG-. <br />Rob Wilson <br />Public Works Director <br />Fiscal Review: <br />David P. ulver <br />Director of Finance <br />Approve by: <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1. Project Locations by Street <br />2. Bid Summary <br />3. Funding and Estimated Expenditures Summary <br />4. Contract <br />Page 2 of 2 <br />