My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
052008
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 1:19:06 PM
Creation date
5/15/2008 1:19:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/20/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />THE CITY OF <br />~~~ ~ <br />I~F~ H, : „ .,.r <br />j'L~~S~NTON® <br />CITY COUNCIL AGENDA REPORT <br />May 20, 2008 <br />Public Works Department <br />TITLE: APPROVAL OF PLANS AND SPECIFICATIONS, REVIEW OF BIDS AND <br />AWARD OF CONTRACT TO GEORGE BIANCHI CONSTRUCTION INC. IN <br />THE AMOUNT OF $162,149 FOR ANNUAL SIDEWALK MAINTENANCE, <br />CIP NO. 075012 <br />SUMMARY <br />Bids have been received for the subject project and staff is recommending award of the <br />construction contract to the lowest responsible bidder in the amount of $162,148.73. <br />The project consists of the removal and replacement of damaged concrete curb and <br />gutter, sidewalk, driveways and curb through drains and installation of new access <br />ramps on various City streets. <br />RECOMMENDATION <br />1. Approve the plans and specifications for this project. <br />2. Review the bids received and award the construction contract for the subject project <br />to George Bianchi Construction Inc. of San Jose in the amount of $162,148.73. <br />3. Authorize the City Manager to enter into the above contract. <br />4. Authorize the Director of Public Works to approve and execute contract change <br />orders for a contingency amount not-to-exceed $33,000 (approximately 20% of the <br />contract) for necessary related subject project work. <br />FINANCIAL STATEMENT <br />This project will replace and upgrade existing infrastructure and should not increase <br />maintenance costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.