My WebLink
|
Help
|
About
|
Sign Out
RES 86077
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2012 4:24:49 PM
Creation date
12/13/1999 11:53:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/4/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Predesign Analysis and Report: The report gen- <br /> erated by all the above will be prepared for City <br /> approval and to provide documentation for Sub- <br /> task 1B. Estimated Fee: $10,000.00 <br /> <br /> Subtask 1A Total Estimated: $40,000.00 <br /> <br /> SUBTASK 1B: FINAL DESIGN FOR SITEWORK <br /> <br />This subtask will provide drawings and specifications for <br />the following areas relative to the Sycamore Reservoir and <br />Transmission Lines: <br /> <br /> o All-weather access roadway (based upon an estimat- <br /> ed 2,500 feet of road; two design sheets) <br /> <br /> o Transmission Lines (based upon an estimated <br /> 5,000 feel of pipeline; four design sheets) <br /> <br /> o Excavation of tank site (two design sheets) <br /> <br /> o Miscellaneous details related to the site (six <br /> design sheets) <br /> <br />In addition, this subtask will also include activities <br />related to the bid and award and services during con- <br />struction for this sitework. This estimate assumes a 45 day <br />construction period and bid and award activities over a two <br />month period. Also included is construction site surveying. <br /> <br />Estimated Fees: <br /> <br /> o Final Site Design based upon <br /> 14 sheets and specifications: $65,000 <br /> <br /> o Bid and Award and Services During <br /> Construction: $18,000 <br /> <br /> o Construction Surveying 7,500 <br /> Subtask 1B Total: $90,500 <br /> <br /> SUBTASK 1C: ADDITIONAL WORK REQUIRED BY CITY <br /> <br />Any work outside this scope of services required by the City <br />will be performed by CH2M HILL and reimbursed at the rates <br />as shown in Exhibit B. <br /> <br /> - 2 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.