Laserfiche WebLink
o Predesign Analysis and Report: The report gen- <br /> erated by all the above will be prepared for City <br /> approval and to provide documentation for Sub- <br /> task 1B. Estimated Fee: $10,000.00 <br /> <br /> Subtask 1A Total Estimated: $40,000.00 <br /> <br /> SUBTASK 1B: FINAL DESIGN FOR SITEWORK <br /> <br />This subtask will provide drawings and specifications for <br />the following areas relative to the Sycamore Reservoir and <br />Transmission Lines: <br /> <br /> o All-weather access roadway (based upon an estimat- <br /> ed 2,500 feet of road; two design sheets) <br /> <br /> o Transmission Lines (based upon an estimated <br /> 5,000 feel of pipeline; four design sheets) <br /> <br /> o Excavation of tank site (two design sheets) <br /> <br /> o Miscellaneous details related to the site (six <br /> design sheets) <br /> <br />In addition, this subtask will also include activities <br />related to the bid and award and services during con- <br />struction for this sitework. This estimate assumes a 45 day <br />construction period and bid and award activities over a two <br />month period. Also included is construction site surveying. <br /> <br />Estimated Fees: <br /> <br /> o Final Site Design based upon <br /> 14 sheets and specifications: $65,000 <br /> <br /> o Bid and Award and Services During <br /> Construction: $18,000 <br /> <br /> o Construction Surveying 7,500 <br /> Subtask 1B Total: $90,500 <br /> <br /> SUBTASK 1C: ADDITIONAL WORK REQUIRED BY CITY <br /> <br />Any work outside this scope of services required by the City <br />will be performed by CH2M HILL and reimbursed at the rates <br />as shown in Exhibit B. <br /> <br /> - 2 - <br /> <br /> <br />