Laserfiche WebLink
B. Alternative Services <br />At its discretion, the City may authorize additional work within the limits of the budgeted <br />contingency, including but not limited to the following: <br />Proj ect Acceptance and Close Out: CM will schedule and conduct punch list walk <br />through and will prepare and distribute punch list to Project Manager, Contractor, <br />and Architect. CM will assure that punch list work is completed. CM will collect <br />and distribute all required Operation & Maintenance manuals. CM will review and <br />accept warranties. CM will schedule and assure that all training and equipment <br />testing is completed prior to acceptance. CM will review as-builts to assure they <br />reflect as-built conditions. Project Close Out scope of services costs not-to-exceed <br />$8,960. <br />2. SUB-CONSULTANT: To oversee and monitor hazardous material abatement by <br />the contractor per recommendations in the contract bid specifications and per <br />applicable laws. Project cost to monitor hazardous material abatement not-to-exceed <br />$10,000. <br />13 <br />