Laserfiche WebLink
Bay-Friendly Scorecard for Commercial & Civic Landscapes <br />- This scorecard tracks Bay-Friendly features incorporated into the design and constructon i , <br />of new landscapes. The recommended minimum requirements for allay-Frienldy <br />Landscape are: earn a total of 60 points or more and complete the 9 required practices <br />indicated by the red "R" in the columns labeled "Possible Points". <br />Date: ~ Current Point Total: Q j <br />-- --- --__ __ ~I <br /> <br /> <br /> <br /> <br />u <br />Site Planning <br />1. Select and evaluate the site carefully <br />a. Submit the completed Bay-Friendly Site Analysis form before 100% design development documents <br />b The site is located within an urban growth boundary and avoids environmentally sensitive sites <br />__~._~~_.._ _ ..__ _-. _.---- d,._.__.. _...._-__ ______ _._ _ <br />c. The site development results in the clean up of a contaminated site (i.e. brownfield) or is in a designated <br />redevelopment area <br />2. Consider the potential for fire <br />a. For sites adjacent to fire sensitive open space or wildlands only: Submit a Fire Mitigation Plan <br />3. Keep plant debris on site <br />a. Produce mulch from plant debris <br />i. Design documents specify areas under tree & shrub canopies and at least 10 feet away from hard <br />surfaces and storm drains, to be used as a leaf repository far mulch <br />ii. Construction documents specify that of the trees identified for removal, some are chipped for use as <br />mulch onsite <br />_------- <br />b. Produce compost from plant debris <br />i. Asite for composting is included in landscape plans. Systems for composting up to and including 3 cubic <br />yards at one time <br />^ ii. Systems for composting more than 3 and up to 10 yards at one time (total 2 points) <br />~__ __ __ _ _ _ _ __ __.d _---_ _ <br />^ iii. Systems 10 cubic yards or larger (total 3 points) <br />4. Reduce and recycle waste <br />^ a. An easily accessible area is dedicated to the collection and storage of materials for recycling <br />5. Minimize site disturbance <br />___- _ --- <br />^ a. On greenfield sites, limit site disturbance to protect topography, vegetation and hydrology (total 3 points) <br />^ b. On previously developed sites, restore vegetation and hydrology (total 3 points) <br />^ 6. Provide water and/or shelter for wildlife such as birdhouse, bathouses, boulders, logs, wood piles, large <br />native shrubs or trees <br /> T r ~ <br /> <br />~ I <br />~ <br />ra N ,p <br /> <br />J N ~o <br />~ <br />d <br />~ C <br />d d ~ W Q "O <br />l <br />U <br />N J <br />N ~ +_-. <br />~ d <br />d d <br />d ~ <br />C <br />~ <br />d <br />+ <br />-. <br />C <br />d 'O N <br />C N <br />J J ~ ~ <br />~' <br />~ H <br />C N <br />C +d-r <br />~ <br />~ A <br />d <br />U <br /> Z <br />A. <br />.r_. U <br />__..~ U _..: ......._.. <br /> ___. . <br />. <br />Pos sible P oints <br />0 f <br />~ 5 <br />0 <br />, 3 <br />0 I 3 <br />0 5 <br />_..i _ <br />0 i 1 <br />2 <br />Oj1 <br />0 j 1 <br />~i <br />0 <br />1 1 <br />1 1 <br />1 <br />7. Conserve or restore natural areas & wildlife corridors <br />^ a. The landscape is designed to preserve 80% of existing mature healthy trees and penalties for destruction of ~ <br />protected trees are included in construction contract I 0 + 2 <br />i <br />^ b. The landscape is designed to increase open space compared to its previous use and/or to connect it to other <br />open space or wildlife corridors <br />^ c. Create or protect a diverse plant buffer of low maintenance vegetation along creeks, shorelines or <br />monocultured landscaped areas <br />Site Plannino Subtotal, out of possible 33 poir <br />0 I 2 <br />0 2 <br />Bay Friendly Landscaping 2008 <br />GreenPoint Checklist Edition Page 1 of 7 <br />