Laserfiche WebLink
c. Preparation of rules for distributing assessments <br /> under supervision of the Director of Public Works. <br /> Preparation of the assessment roll, and such other <br /> documents as may be necessary in an assessment <br /> proceeding. <br /> <br /> d. Furnishing trial spreads showing distribution of <br /> <br /> assessments for City review. <br /> <br /> e. Furnishing itemization of District's share of project <br /> <br /> costs. <br /> <br /> f. Furnishing 20 copies of Final Assessment Spread and <br /> <br /> bound Engineer's Report. <br /> <br /> g. Respreads as a result of amended assessments based on <br /> a final redistribution of costs shall be included <br /> under this item of work. <br /> <br /> h. Preparation of supplemental distribution of <br /> construction costs. <br /> <br /> 7. Time of Payment of Engineer's Fee "A": Items to be <br />paid for on the basis of Engineer's Fee "A" shall be due and <br />payable to CONSULTING ENGINEER thirty (30) days from date of <br />invoice, in accordance with the following schedule: <br /> <br /> Progress billings are to be made once each thirty <br /> days during the progress of the work. <br /> <br /> <br />