Laserfiche WebLink
Resolution No. PC-87-129 <br />December 9, 1987 <br />30. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems be <br />installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer. <br />31. That the developer be responsible for the installation of <br />the street lighting system serving the development. The <br />street lights shall be 70 watt, high pressure sodium vapor <br />units mounted on galvanized steel poles with poured in place <br />bases,on the LS-1C schedule per City requirements and PG&E <br />standard details unless otherwise specifically approved. <br />Approval for the number, location, and type of electroliers <br />shall be withheld pending final design and review by the <br />City Engineer. <br />32. That this development provide a safe and effective <br />circulation system for bicycles and pedestrians. These <br />facilities shall be designed and installed to the <br />satisfaction of the City Engineer and shall be separated <br />from vehicular traffic whenever possible. <br />- 7 - <br />