Laserfiche WebLink
Resolution No. PC-87-25 <br />March 11, 1986 <br />10. That any existing assessment district, which the property <br />may be subject to, be cleared prior to the approval of the <br />final map or the developer will cause a segregation to be <br />completed in conjunction with the final map. <br />11. That the developer submit a refundable cash bond for hazard <br />and erosion control prior to approval of the final map. The <br />amount of this bond will be determined by the City Engineer. <br />(Approximately $100 per lot - $2500 minimum.) <br />12. That the developer (subdivider) may file multiple final maps <br />prior to the expiration of the conditionally approved <br />tentative map for this development; provided, however, that <br />each such final mao filed shall provide for all normal and <br />C <br />13. That the developer dedicate to the City for street <br />right-of-way purposes, those parcels of land intended to be <br />public streets. <br />14. That the developer grant an easement to the City over those <br />parcels shown as public service easements (P.S.E.) and which <br />are approved by the City Engineer or other parcels which may <br />be designated by the City Engineer. <br />15. That vertical P.C.C. curbs and gutters be constructed within <br />this development unless otherwise approved by the City <br />Engineer and that the curb and gutter be poured <br />monolithically with the sidewalk when the sidewalk is <br />adjacent. <br />16. That all existing wells, septic tanks or holding tanks on <br />the site be properly sealed, filled and abandoned prior to <br />the start of grading operations unless Zone 7 retains <br />specific wells for observation wells, or special approval is <br />obtained from the City Engineer for temporary use of an <br />existing well for construction water. <br />17. Any wells designated for abandonment or any wells <br />encountered during construction, are to be destroyed in <br />accordance with a permit obtained from Zone 7 by calling <br />(415) 443-9300. <br />18. That the haul route for all materials to and from this <br />development be approved by the City Engineer prior to the <br />start of any construction. <br />19. That the developer submit an erosion and sedimentation <br />control plan or procedure as part of the improvement plans <br />prior to the final approval of the development. <br />20. That the developer submit a dust control plan or procedure <br />as part of the improvement plans prior to the final approval <br />of the development. <br />REVISED 3/9/87 <br />