Laserfiche WebLink
the Project site, have mitigated or will mitigate water <br />services impacts of the Project to a level of insignificance. <br />I. Public Services And Utilities-Wastewater. <br />1. Facts. <br />Wastewater from the Project site would receive primary <br />and secondary treatment from the Dublin-San Ramon Services <br />District, and the DEIR indicates at page 65 that adequate <br />capacity is available for treatment and disposal of wastewater <br />from proposed development of the Project site. The DEIR <br />further indicates that development of the Project site with the <br />proposed low density residential use would generate wastewater <br />flows of approximately 108,800 gallons per day, requiring sewer <br />connections to two adjacent sewers located along Interstate 80 <br />and along Bernal Avenue. <br />The Project does not contain any mitigation measures <br />with respect to wastewater, and the DEIR recommends on page 65 <br />that one additional mitigation measure be incorporated into the <br />Project. This mitigation measure, listed as no. 1 on page 65, <br />calls for policies in future development plans to encourage low <br />flow fiztures. <br />Neither the DEIR nor the Final EIR states that the <br />Project's impacts related to wastewater constitute a <br />significant adverse impact of the Project. The DEIR's list on <br />page 89 of significant unavoidable adverse impacts of the <br />Project does not include wastewater impacts. <br />22 <br />