My WebLink
|
Help
|
About
|
Sign Out
PC-88- 26
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1988
>
PC-88- 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:35:20 AM
Creation date
3/26/2008 12:21:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/9/1988
DOCUMENT NO
PC-88- 26
DOCUMENT NAME
SP-87-1
NOTES
TMI ANALYSTS, INC
NOTES 2
REQUIRED FINDINGS AS REQUIRED BY CEQA FOR TMI SPECIFIC PLAN
NOTES 3
NW CRNR OF INTERSECTION I-680 AND BERNAL AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
have mitigated or will mitigate traffic circulation impacts of <br />the Project to a level of insignificance. <br />F. Air Ouality. <br />1. Facts. <br />The Project and subsequent development of the Project <br />site would increase the emission of air pollutants from <br />vehicles although the DEIR indicates at page 59 that the <br />resulting change in overall emissions would be relatively <br />small. The DEIR further indicates that the Project will not <br />cause no measureable change in particulate levels at the <br />Stoneridge site and is expected, and states that particulate <br />levels at the Stoneridge site are not expected to ezceed state <br />or federal standards either during construction or once <br />construction is completed. The DEIR concludes that vehicular <br />emissions represent an insignificant increase in air pollution <br />concentrations in the subregional air basin containing the <br />Project site. <br />The Project includes as a mitigation measure the <br />development of public transit stops with any Bernal Avenue or <br />Foothill Road redesign or improvement, and this measure is set <br />forth as Mitigation Measure 1 on page 60 of the DEIR. <br />The DEIR recommends at page 60 that two additional <br />mitigation measures be incorporated to reduce air quality <br />impacts during construction. These mitigation measures are <br />listed as Measures 3 and 4 on page 60 (Measure 2 is actually an <br />introductory paragraph to Measures 3 and 9). These measures <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.