My WebLink
|
Help
|
About
|
Sign Out
RES 87169
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 4:46:54 PM
Creation date
12/11/1999 12:43:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. Reconstruction of Hopyard Road between the intersections of <br /> Hopyard Road at Owens Drive and Dougherty Road at Dublin <br /> Boulevard to conform to new lane arrangements and street grades. <br /> <br /> c. Modification of all on and off-ramps to conform to new grades. <br /> <br />d. Widening of both freeway off-ramps to four lanes (two right turn <br /> lanes and two left turn lanes) at the intersection of Hopyard <br /> Road. <br /> <br /> e. Signalization of the intersections formed by the freeway <br /> off-ramps and Hopyard Road. <br /> <br />f. Land acquisition. <br /> <br />2. 1-580 Auxiliary Lanes from Hopyard Road to 1-880 <br /> <br /> a. Construction of an additional lane on easthound 1-580 beginning <br /> at the 1-680 on-ramp to 1-580 and ending at the off-ramp at <br /> Hopyard Road. The off-ramp at Hopyard Road will he converted to <br /> a two lane exit. <br /> <br /> h. Construction of an additional lane on westhound 1-580 beginning <br /> at the loop on-ramp at Hopyard and ending with the 1-680 <br /> off-ramp. The off-ramp at 1-680 will he converted to a two lane <br /> off-ramp requiring modification of the existing bridge over the <br /> Alamo Canal. <br /> <br /> 3. Stoneridge Drive/I-680 Interchange <br /> <br /> a. Widening existing overcrossing to add an easthound lane. <br /> <br /> h. Construction of two new directional on-ramps and two new loop <br /> on-ramps. The north_bound on-ramps require bridges to cross the <br /> Alamo Canal. <br /> <br /> c. Construction of two new off-ramps that provide four lanes (two <br /> right turn and two left turn lanes) at each intersection with <br /> Stoneridge Drive. Northhound off-ramp requires a bridge to <br /> cross the Alamo Canal. <br /> <br /> d. Signalization of the two intersections formed hy the off-ramps <br /> with Stoneridge Drive. <br /> <br /> e. Right-of-way acquisition. <br /> <br /> 1-880 Auxiliary La~es from Stoneridge Drive to 1-580 <br /> <br /> a. Construction of an additional lane on northhound 1-680 between <br /> Stoneridge Drive/I-680 Interchange and 1-580/I-680 Interchange. <br /> <br /> h. Construction of an additional lane on southhound 1-880 between <br /> 1-580/I-880 Interchange and Stoneridge Drive Interchange. <br /> <br /> 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.