Engineer and/or the Chief Building and Safety Official and shall be inspected <br />annually. Refer to Condition No. 30 for initial temporary use restrictions. <br />89. All excess soil from the site shall be off-hauled from the site and disposed of in a <br />lawful manner. No temporary stockpiling of dirt on this site shall occur without <br />specific review and approval by the Planning Department. <br />90. The project developer shall obtain all necessary State and Federal agency <br />environmental permits before approval of the final subdivision map or, at the <br />discretion of the City Engineer and Planning Director, the issuance of a grading <br />permit. <br />91. Unless otherwise approved by the City Engineer, the storm drainage from each <br />lot shall be directed to the street or to an approved storm drain system in <br />accordance with Sections 2907(b)(5) and 7012(d) of the 1988 Uniform Building <br />Code. <br />92. Unless otherwise approved by the City Engineer, all fill and cut slopes shall be <br />3:1 horizontal to vertical or less. <br />93. All existing on-site utility lines and all utilities required to serve the proposed <br />development on-site shall be installed underground in a joint utility trench, unless <br />otherwise determined by the City Engineer. Arrangements shall be made with <br />the adjacent property owner at 1666 Frog Hill Lane to ensure that service to the <br />well is not interrupted, and the property owners shall be notified one week in <br />advance of the commencement of work. <br />94. The project developer shall comply with the recommendations of the <br />geotechnical report entitled "Geotechnical Investigation on Proposed Residential <br />Development Lot 27, 1630 Vineyard Ave" prepared by Terrasearch, Inc. and any <br />supplemental peer review or response letters. The applicants shall address the <br />peer review comments to the satisfaction of the City Engineer prior to parcel map <br />approval. The project developer's geotechnical consultant shall review and <br />approve all foundation, retaining wall, and drainage geotechnical aspects of the <br />final development plans to ensure that the recommendations have been properly <br />incorporated into the development. The consultant shall certify by writing on the <br />plans or as otherwise acceptable to the Chief Building Official that the final <br />development plan is in conformance with the geotechnical report approved with <br />the project. <br />95. The project developer shall arrange and pay for the geotechnical consultant to <br />inspect and approve all foundation, retaining, and wall and drainage geotechnical <br />aspects of project construction. The consultant shall be present on site during <br />grading and excavation operations. The results of the inspections and the as- <br />built conditions of the project shall be certified in writing by the geotechnical <br />consultant for conformance to the approved plans and geotechnical report and <br />18 <br />