My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
030408
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2008 9:20:42 AM
Creation date
2/29/2008 9:20:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/4/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />ANNUAL RESURFACING OF VARIOUS CITY STREETS <br />CIP NO. 075003 <br />03/04/08 <br />Project Funding Amount <br />2007-08 CIP Allocation $2,250,000 <br />Transfer from Annual Resurfacing Project (CIP 065003) $429,773 <br />Transfer to Annual Curb & Gutter Project (CIP 065009) ($65,000) <br />Total $2,614,773 <br />Project Expenditures <br />Construction Testing Services (Engineering Services) $2,738 <br />Ponte General Engineering $3,109 <br />Econolite (Installation of camera on traffic signal) $8,652 <br />Materials $5,501 <br />Miscellaneous Expenses (ads, adjusting driveway to match road) $1,949 <br />De Silva Gates Construction Approved Contract $1,777,687 <br />De Silva Gates Contract Change Orders ($185,249) <br />Total Project Expenditures $1,614,386 <br />Project Balance <br />Project Balance $1,000,387 <br />
The URL can be used to link to this page
Your browser does not support the video tag.