My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT FOR CONSULTANT SERVICES <br />FOR <br />SANITARY PUMP STATION S-6 REPLACEMENT <br />THIS AGREEMENT is made and entered into this _ day of , <br />2008, by and between the CITY OF PLEASANTON, a municipal corporation ("City"), <br />and Carollo Engineers whose address is 2700 Ygnacio Valley Road, Suite 300, Walnut <br />Creek, CA 94598 and telephone number is (925) 930-0208, ("Consultant"). <br />WITNESSETH: <br />A. Consultant is qualified to provide, and experienced in providing <br />engineering and pump station related services and has offered its services for the <br />purposes specified in this Agreement. <br />B. In the judgment of the City, it is necessary and advisable to employ the <br />services of Consultant for the purposes provided herein. <br />NOW THEREFORE, in consideration of the mutual covenants, agreements and <br />conditions contained herein, City and Consultant agree as follows: <br />1. Consultant's Services. Consultant shall diligently perform the services <br />and furnish the materials, reports, drawings, and related materials as hereinafter set forth: <br />a. Consultant shall perform all work described in Exhibit "A", Scope <br />of Work, attached hereto and incorporated herein by this reference. <br />b. Consultant shall meet with the technical staff of the City, other <br />pertinent agencies, and/or landowners as necessary to complete the <br />scope of work outlined in Section 1 (a) above. <br />2. Citv Services. In order to assist Consultant in this work, City shall <br />provide, if necessary, title reports, any existing plans of the area on file, necessary <br />direction and plan checking within a reasonable time. <br />3. Staff. The Project Manager for Consultant shall be Sarwan Wason, who <br />may not be replaced without written consent of City. <br />4. Sufficiency of Consultant's Work. All reports, drawings, plans and <br />specifications prepared for City shall be adequate and sufficient to meet the purposes for <br />which they are prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.