My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Budget <br />The Capital Improvement Program has identified PS-6 for wet well and pumps <br />replacement, with an amount of $500,000 being budgeted in Fiscal Years 2001-02, <br />2003-04, 2004-05, 2005-06 and 2006-07. Funds were borrowed from this CIP to <br />undertake emergency repairs when heavy storms exposed a sewer pipeline under the <br />Arroyo Mocho and eroded soil support for the line. All funds set aside for this <br />emergency project, except funds reserved for required monitoring, have since been <br />reimbursed by FEMA and the State Office of Emergency Services. The current budget <br />balance for this project, less this engineering design contract, is $2,017,982. The pre- <br />design study indicates a preliminary cost estimate for construction of the new pump <br />station at $2,500,000. This estimate does not include engineering and construction <br />support services. It appears that additional funding will be needed when the project is <br />ready for construction. Staff will prepare a request for an allocation of additional funds <br />for the next Capital Improvement Project (CIP) budget and/or Budget Option Plan, for <br />approval. <br />Submitted by: Fiscal Review: Approve by: <br />~.-c~.,.~. c - . -~-- <br />Rob Wilson David P. Culver Nelson Fialho <br />Director of Public Works Director of Finance City Manager <br />Attachments: <br />1. Proposed Contract with Scope of Work (Exhibit A) and Rate Schedule (Exhibit B) <br />2. Funding and Expenditure Summary <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.