My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachement E <br />PBS&J Proposal <br />We assume that the City of Pleasanton will act as CEQA lead agency for the IS/MND. We also <br />assume the City of Pleasanton and Carollo Engineers will have primary review responsibilities <br />for the administrative draft IS/MND prior to producing and public circulating a Draft document. <br />Work Plan <br />Preparation of the environmental documents will include seven (7) general tasks. <br />Task 1: Project Initiation and Document Review <br />PBS&J will meet with Carollo Engineers and the City of Pleasanton to commence the <br />environmental review process. At this meeting, documents and design plans relevant to the <br />proposed project and environmental review will be identified and/or collected from City staff and <br />the project engineers. Additionally, this meeting will be used to review the project description, <br />scope of work, and schedule and make any necessary refinements to any of these items. <br />Task 2 Project Description <br />PBS&J will- prepare a draft project description from information provided by Carollo Engineers <br />and the City of Pleasanton for use in the proposed environmental documents. The draft project <br />description may also be used during scoping efforts with public agencies, residential neighbors, <br />and other interested individuals. PBS&J will submit the draft project description to Carollo <br />Engineers and the City of Pleasanton for review and comment early in the environmental <br />process. We anticipate that certain activities associated with Task 3 (Prepare Administrative <br />Draft IS/MND) will be carried out concurrently with Task 2 activities. These activities include, <br />but may not be limited to, a site visit of the project area to assist in an assessment of the <br />proposed project on neighboring residents and potential encroachment into West Las Positas <br />Road rights-of way. In preparing the project description, PBS&J will collaborate with Carollo <br />Engineers and the City of Pleasanton to define a preferred alternative while considering <br />potential construction costs, environmental constraints and land acquisitions. <br />Task 3 Prepare Administrative Draft Environmental Documents (IS/MND ~ EA) <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.