My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Huy A. Ho, P.E. <br />The City of Pleasanton <br />January 30, 2008 <br />Page 5 <br />improvements similar to that described in the request for proposal and <br />referenced pre-design studies. <br />The drawings and technical specifications shall be developed for competitive <br />bidding of the construction work. Technical specifications will be provided in <br />Engineer's standard CSI format. City will prepare boilerplate (front-end) <br />specifications with assistance from Engineer on summary of work, constraints, <br />and sequencing. Drawings will be prepared to Engineer's CAD standards. <br />Anticipated drawings are detailed in the drawing list included as Exhibit C. <br />The ENGINEER shall submit half-size copies of the 50 and 90 percent complete <br />drawings and specifications for City review and comment. 50 and 90 percent <br />complete review comments will be incorporated into the design. 100 percent (Not <br />for Construction) half-size drawings and specifications shall be submitted for <br />approval prior to the Final Submittal required as part of Task 6.2. Updated <br />construction cost estimates shall be provided for 50 percent, 90 percent, and <br />100percent (Not for Construction) submittals. <br />6.2 Final Submittal: After receipt of final approval from the City, Engineer shall submit <br />an original set of stamped and signed drawings (22"x34" Velum) and <br />specifications. Additionally, Engineer shall submit CD of final drawings, <br />specifications, estimate, and any project related calculations. <br />Deliverables: <br />50 percent and 90 percent Submittal: Half size drawings and <br />specifications (10 sets). Engineer's construction cost estimate (pdf <br />format). <br />100 percent (Not for Construction) Submittal: Half size drawings and <br />specifications (2 sets). Engineer's construction cost estimate (pdf format). <br />Final Submittal: Stamped and signed 22" x 34" Velum drawings (one <br />original set); Stamped and signed 8112" x 11"specifications (one original <br />set); CD containing electronic drawings (AutoCad format), electronic <br />specifications (Word format), construction estimate (pdf format), and any <br />project related calculations (pdf). <br />7.0 Bid Period Services: <br />7.1 Bid Period Services: Engineer will support City during bidding efforts on an as <br />requested basis. Anticipated services include attendance at the pre-bid meeting, <br />attendance at one scheduled site visit, answering of technical questions from <br />bidders, preparation of addenda, and assistance in review of bids and <br />recommendation of award. It is assumed City will manage bid period efforts <br />including advertisement, printing, and distribution of bidding documents, <br />facilitating pre-bid meeting and site visits (including preparing agenda and <br />meeting minutes), answering non-technical questions from bidders, and printing <br />and distribution of addenda. Since level of effort is unknown at this time, a <br />H:~Fina~Pleasanton_WCO~ContracllFlevisedTasklLetterHo.doc Page 5 Of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.