My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENT 01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
020508
>
16 ATTACHMENT 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2008 3:05:29 PM
Creation date
1/30/2008 2:34:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/5/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
16 ATTACHMENT 01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28. Before project final, all landscaping shall be installed, reviewed, and approved by <br />the Planning Director. <br />GENERAL <br />29. The PUD development plan approval shall lapse two years from the effective date <br />of this ordinance unless a building permit is obtained and construction diligently <br />pursued. <br />30. The project developer shall work with the Pleasanton Unified School District and <br />the City Planning Director to develop a program, in addition to the school impact <br />fees required by State law and local ordinance, to off-set this project's long-term <br />effect on school facility needs in Pleasanton. This program shall be designed to <br />fund school facilities necessary to offset this project's reasonably related effect on <br />the long-term need for expanded school facilities to serve new development in <br />Pleasanton. The method and manner for the provision of these funds and/or <br />facilities shall be approved by the City and in place prior to issuance of building <br />permits. In no event shall construction commence unless the above method and <br />manner for the provision of these funds and/or facilities has been approved by the <br />City. <br />31. All conditions of approval for this case shall be reprinted and included as a plan <br />sheet(s) with the building permit plan check sets submitted for review and <br />approval. These conditions of approval shall be on, at all times, all grading and <br />construction plans kept on the project site. <br />32. Prior approval from the Planning Department is required for any changes to site <br />design, grading, building design, building colors or materials, landscape material, <br />etc. <br />33. A construction trailer may be placed on the project site for daily <br />administration/coordination purposes during the construction period. At no time <br />shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles, if any, shall be <br />removed from the site at the end of each workday. <br />34. The approved building materials and colors shall be stated on the building permit <br />plans to the satisfaction of the Planning Director. Substitutions shall not be <br />allowed unless otherwise approved by the Planning Director. <br />35. All site improvements and house construction activities shall be limited to the <br />hours of 8:00 a.m. to 5:00 p.m., Monday through Friday, excluding federal <br />holidays. All construction equipment must meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. The <br />Planning Director may allow earlier "start-times" for specific construction activities <br />(e.g., concrete-foundation/floor pouring), if it can be demonstrated to the <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.