My WebLink
|
Help
|
About
|
Sign Out
16 ATTACHMENT 01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
020508
>
16 ATTACHMENT 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2008 3:05:29 PM
Creation date
1/30/2008 2:34:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/5/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
16 ATTACHMENT 01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
satisfaction of the Planning Director that the construction noise and traffic will not <br />affect nearby residents. <br />Building Conditions <br />36. The project developer shall obtain a building permit from the Building and Safety <br />Division and any other applicable City permits for the project prior to the <br />commencement of any construction. <br />37. The project developer shall pay any and all fees to which the project may be <br />subject to prior to issuance of a building permit. The type and amount of the fees <br />shall be those in effect at the time the building permit is issued. <br />38. The building permit plan check materials will be accepted for submittal only after <br />the ordinance approving the PUD development plan becomes effective, unless the <br />project developer submits a signed statement acknowledging that the plan check <br />fees may be forfeited in the event that the ordinance is overturned or that the <br />design is significantly changed. In no case will a building permit be issued prior to <br />the effective date of the ordinance. <br />39. All structures covered by this approval shall be constructed to: <br />a) Meet Title 24 state energy requirements, and <br />b) Comply with all codes and ordinances in effect before the Building and <br />Safety Division will issue permits. <br />40. The project developer shall submit three copies of the site geotechnical report to <br />the Chief Building Official for third party peer review and shall pay for such review <br />at the time specified by the Director, but in all cases before the issuance of a <br />grading permit. <br />41. A final inspection by the Planning Department is required prior to occupancy and <br />prior to final building permit inspection. <br />42. During Construction, the project developer is responsible for implementing the <br />following measures: <br />a) Portable toilets shall be kept as far as possible from existing residences and <br />shall be emptied on a regular basis as necessary to prevent odor. <br />b) Ensure that the project contractor is aware of, and abides by, all conditions <br />of approval. The project developer is especially responsible for ensuring that <br />the contractor is aware of and implements all erosion control/storm water <br />quality measures. <br />c) Ensure that the project landscape contractor is aware of, and adheres to, the <br />approved landscape and irrigation plans. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.