My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
012908
>
04 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2008 4:55:21 PM
Creation date
1/23/2008 4:48:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/29/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENT 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />3. Circulation Element <br />Policy 2: Phase development and roadway improvements so that levels of service at <br />adjacent major intersections do not exceed LOS D at major intersections outside <br />Downtown and gateway intersections, except as noted below.s <br />Program 2.1: Monitor roadway improvements to determine if levels of service <br />are approaching City standards. <br />Program 2.2: Require site-specific traffic studies for all major developments <br />which have the potential to exceed LOS D at major <br />intersections, and require developers to implement the <br />mitigation measures identified in these studies. In general, the <br />City requires development to improve congested adjacent <br />intersections or to pay its pro-rata share of the cost of such <br />improvements, and to pay traffic-improvement fees (TIF) for <br />use in mitigating traffic impacts in other areas of the city. <br />Program 2.3: The Santa Rita Road/Valley Avenue intersection is conditionally <br />exempted from the City's LOS D policy in that the mitigation of <br />adding a third southbound left turn lane is a short-term <br />mitigation, with buildout mitigation being the Stoneridge Drive <br />extension. The City Council shall decide if and when this <br />intersection modification is needed in conjunction with <br />development projects which add traffic to it. Projects which add <br />traffic but are not required to improve this intersection will <br />continue to pay Traffic Improvement Fees and will be <br />considered to have mitigated their impact at the Santa Rita Road <br />/Valley Avenue intersection on that basis. <br />Program 2.4: Use the City's Baseline Traffic Report to address specific criteria <br />to establish when a traffic impact study is required for a <br />development proposal and to identify the scope and contents of <br />the traffic report. <br />Program 2.5: Continuously upgrade the City's traffic computer and signal <br />system to better monitor traffic flows and to translate traffic <br />volumes into levels of service. <br />Program 2.6: Report potential level of service exceedances in a regular <br />baseline report to City Council and affected developers. <br />' iVlajor intersections are those intersections of two or more arterials or one arterial and one collector street. Gateway <br />intersections are those intersections located at the edges of the city. <br />Circulation Element 012908 clean 3-45 City Council 012908 <br />
The URL can be used to link to this page
Your browser does not support the video tag.