My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
012908
>
04 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2008 4:55:21 PM
Creation date
1/23/2008 4:48:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/29/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENT 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 3. Circulation Element <br />GOALS, POLICIES, AND PROGRAMS <br />Streets and Highways <br />Goal 1: Develop a safe, convenient and uncongested circulation system. <br />Goal 2: Develop and manage a local and regional street and highway system which accommodates <br />future growth while maintaining acceptable levels of service. <br />Policy 1: Complete the City's street and highway system in accordance with the General <br />Plan Map, Figures 3-7 and 3-10, and Table 3-8. <br />Program 1.1: Require new developments to pay for their fair share of planned <br />roadway improvement costs. <br />Program 1.2: Update the Traffic Impact Fee study consistent with <br />improvements needed to implement the General Plan circulation <br />system. <br />Program 1.3: Support the use of assessment districts to equitably spread the cost <br />of new roadways and improvements and to facilitate installation of <br />improvements with development. <br />Program 1.4: Continue to implement the North Pleasanton Improvement <br />District infrastructure cost sharing fee for non-participatory <br />properties which benefit from the District. Review and modify the <br />North Pleasanton Improvement District for future development <br />not anticipated when the District was implemented. <br />Program 1.5: Preserve rights-of--way needed for local and regional roadway <br />improvements through dedication of land, as adjacent properties <br />develop. <br />Program 1.6: Provide an emergency vehicle accessway linking Stoneridge Drive <br />to El Charro Road to serve emergency access needs for <br />development of Staples Ranch until such time as funding for the <br />Stoneridge Drive extension is approved by the City Council and <br />the extension is constructed. The timetable for construction of <br />the Stoneridge Drive extension will depend on reaching an <br />agreement with Pleasanton's regional partners for a strategic <br />approach and funding plan for relieving traffic congestion in the <br />Tri-Valley. That plan will include improvements to I-580, I-680, <br />and State Route 84, as well as completion of a regional arterial <br />network that includes Dublin Boulevard, Jack London Boulevard, <br />Portola Avenue, and Stoneridge Drive. <br />Circulation Element 012908 clean 3-44 City Council 012908 <br />
The URL can be used to link to this page
Your browser does not support the video tag.