My WebLink
|
Help
|
About
|
Sign Out
RES 87065
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 4:12:13 PM
Creation date
12/10/1999 11:49:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> <br /> SCOPE OF SERVICES <br /> SYCAMORE RESERVOIR AND TRANSMISSION PIPELINE <br /> <br /> AMENDMENT NO. 2 <br /> <br /> This Amendment is for design and construction management <br /> services for the Sycamore Reservoir and Transmission Pipe- <br /> line. <br /> <br /> TASK 2 ADDITIONAl, FIELD INVESTIGATIONr COORDINATIONt AND <br /> PERMITTING <br /> <br /> Subtask 2A: Geotechnical Investigation <br /> <br /> This work will include additional deep borings and laboratory <br /> testing of soils at the selected reservoir and bridge sites <br /> to determine parameters for final design. We assume that <br /> four borings will be required.at the reservoir site and that <br /> one boring will be required at the access bridge site. The <br /> access bridge is assumed to be a single-lane 20-foot span <br /> concrete structure. A final geotechnical report summarizing <br /> the work performed will be written and delivered to the City. <br /> <br /> Subtask 2B: Right-of-Way and Easement <br /> <br />When the general site has been identified and size parame- <br />ters defined, the specific easement requirements for the <br />road, site, and transmission and overflow lines will be de- <br />termined so the City may obtain needed easements. <br /> <br /> Subtask 2C: Plat Preparation and Surveys <br /> <br />All of the above detailed factors will be incorporated into <br />the necessary plats and maps for the site. Field surveys <br />will establish'appropriate support data for preparation of <br />finalized maps, plats, and legal descriptions. <br /> <br />Subtask 2D: Site Procurement <br /> <br />CH2M HILL will assist the City in site procurement activities <br />and may include assistance as needed for environmental docu- <br />mentation. <br /> <br />Subtask 2E: Permitting <br /> <br />CH2M MILL will monitor the progress of approvals and permits <br />required from the County of Alameda for completion of this <br />project and provide information as necessary to expedite <br />approvals. Three meetings with the City of Pleasanton, the <br />County of Alameda, and other interested parties and agencies, <br /> <br /> A-1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.