My WebLink
|
Help
|
About
|
Sign Out
CCMIN110807WS
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2007
>
CCMIN110807WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2008 4:33:55 PM
Creation date
1/16/2008 4:33:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
11/8/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
CCMIN110807WS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY OF PLEASANTON <br />JOINT WORKSHOP <br />OF THE <br />CITY COUNCIL AND PLANNING COMMISSION <br />November 8, 2007 <br />CALL TO ORDER <br />Mayor Hosterman called the joint workshop to order at 6:30 p.m. <br />ROLL CALL <br />Present: Councilmembers Cook-Kallio, McGovern, Sullivan, Thorne, Mayor Hosterman <br />Commissioners Narum, O'Connor, Olson, Pearce, Chair Fox <br />Absent: Commissioner Blank <br />Presentation and discussion of the proposed Staples Ranch Development, including <br />Intent to pursue Acquisition of a five-acre site for a Neighborhood ParWJoint Detention <br />Basin <br />Assistant City Manager Steve Bocian said the developers would be making presentations of <br />their projects, all materials presented were not final, and the purpose of the session was to <br />obtain feedback from the Council and Planning Commission prior to starting the formal review <br />process. He said staff plans to proceed with the purchase and sale agreement in the acquisition <br />of the 5-acre neighborhood park, which would be discussed later in the meeting. <br />He presented the Staples Ranch site map, spoke about the Specific Plan for the site, and <br />provided a brief history of the project area. <br />Mr. Bocian referred to the site plan and said one of the purposes of the workshop is to look at <br />the development not as individual pieces but as a cohesive development. He said the public is <br />viewing a significant amount of development as approved as part of the EI Charro Specific Plan, <br />so there is the potential of 1.5 square feet of retail of which 450,000 square feet is already <br />approved for the prime retail outlet. This will have about 150 tenants in that development and <br />approximately 2,400 parking spaces which should be developed within the next two years. He <br />presented a future retail site and said a portion of it was being constructed jointly by the County <br />and the City to provide flood protection for both Livermore property and for the Staples Ranch, <br />stating that when the Council approved the cost sharing agreement, it also approved the <br />detention area. <br />Commissioner Fox questioned whether the bridge to Arroyo would accommodate a four lane <br />road lane if Stoneridge was ever connected through in the future. City Manager Fialho said the <br />bridge could not accommodate a four lane road; if it goes to four lanes and Stoneridge is ever <br />connected to EI Charro, two bridge structures would be needed, each with two lanes. <br />Commissioner Fox said when the community park was discussed, Brian Swift had said in 2004 <br />that the community master plan for the parks had taken the Staples Ranch Community Park and <br />presented it as a 30-acre park. When the MOU came out, it was 17 acres and she questioned if <br />it was ascertained whether or not the community park was accurate at 30 acres. Mr. Bocian <br />said yes, when the K&B proposal came through, they proposed a 30 acre park. Around that <br />
The URL can be used to link to this page
Your browser does not support the video tag.