My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
18 ATTACHMENT 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2008 3:39:23 PM
Creation date
1/10/2008 3:34:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENT 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. The project developer shall revise the typical section on Road "B" to have a <br />straight cross slope to the north. Road "B" shall be designed to drain <br />stormwater to the bioswale in Parcel "C". This detail shall be designed to <br />the satisfaction of the City Engineer, shall be shown on the <br />grading/drainage plan submitted with the tentative subdivision map <br />application, and shall be subject to Planning Commission review and <br />approval. <br />c. The EVA road connecting the Road "A" cul-de-sac to Montevino Road <br />shall intersect the public streets with a standard driveway. This detail shall <br />be designed to the satisfaction of the City Engineer, shown on the tentative <br />subdivision map application, and shall be subject to Planning Commission <br />review and approval. <br />d. The project developer shall install a concrete lined ditch along the common <br />property line between Parcel "A" and lots 7, 8, and 9. This detail shall be <br />designed to the satisfaction of the City Engineer, shall be shown on the <br />grading/drainage plan submitted with the tentative subdivision map <br />application, and shall be subject to Planning Commission review and <br />approval. <br />e. The project developer shall revise the landscaping at the intersection of <br />Road "A" with Vineyard Avenue to improve sight-line distance. This <br />change shall be designed to the satisfaction of the City Engineer and <br />Planning Director and shall be shown on the final improvement plans. <br />f. The project developer shall revise the grade of Lot 2 to allow the driveway <br />to intersect the street at the bulb. This detail shall be designed to the <br />satisfaction of the City Engineer, shown on the tentative subdivision map <br />application, and shall be subject to Planning Commission review and <br />approval. <br />16. Phase One and Two Improvements <br />a. The project developer shall revise the grades on Street "A" such that the <br />maximum grades at the street intersections is 7-percent or less. This detail <br />shall be designed to the satisfaction of the City Engineer, shown on the <br />tentative subdivision map application, and shall be subject to Planning <br />Commission review and approvai. <br />b. All concrete V-ditches shall be constructed with colored concrete. The <br />Planting Director shall approve the color of the concrete before installation. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.