My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
18 ATTACHMENT 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2008 3:38:31 PM
Creation date
1/10/2008 3:28:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENT 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Conditions of Approval °UD-88-3 <br />Ordinance Plo. 1359 <br />1. That the development shall substantially conform to the plans <br />on file with the Planning Department, Exhibit A, except as <br />modified by these conditions. <br />2. That a final fencing plan be submitted <br />approval by the Planning Director prior to <br />tentative map. This plan shall include <br />retaining walls, perimeter fencing as well <br />soundwall along the Vineyard Avenue frontac <br />necessary by the Planning Director. <br />for review and <br />approval of the <br />design of all <br />as any masonry <br />~e if determined <br />3. That detailed plans depicting the amount, location, storage <br />methods and haul routs to be utilized in the event of a <br />grading imbalance be submitted for review and approval by the <br />Planning Director and City Engineer prior to removal of any <br />soils from the site. <br />4. That the applicant be responsible for posting of signs at all <br />entrances to the project detailing the limitations on <br />construction activity and access that have been imposed on <br />the project. Depicted on the sign shall be the penaitted <br />operating hours (Monday through Friday 8:00 a.m. to 5:00 p.m. <br />for the house construction phase of lots 17, 18, 19, 30, 40 <br />and 41, and 8:00 a.m. to 8:00 p.m. Monday through Friday and <br />10:00 a.m. to 6:00 p.m. on Saturdays, Sundays and holidays <br />for project grading and remainder of house construction), the <br />prohibition on any loud radio noise, the prohibition of <br />bringing dogs to the site and the need to utilize the <br />Vineyard Avenue entrance driveway as the main access to the <br />project. Failure to comply with these restrictions or any <br />construction activity restriction established'by the City <br />could result in the shutting down of the site for a 24+hour <br />period at the discretion of the Planning Director. <br />5. That the applicant be responsible for its pro rata share of <br />the costs for tha northern and southern extensions of Bernal <br />Avenue, consistent with the reimbursement agreements entered <br />into by the City and F. Auf der Maur, et al and Chang <br />Suo-Lin, dated February 16, 1988, respectively. <br />6. That the applicant shall provide all buyers with copies of <br />the project conditions of approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.